How to choose sandwich panels for a building with several operating zones
A workshop, store and cold room can share a building without sharing the same panel specification. Start by mapping the zones. Mark each room's function, temperature and humidity on the floor plan, along with wash-down areas, vehicle entrances and operating equipment. A partition between two zones may have a different job from an outside wall. Note future changes, such as heating part of the store later, so you can distinguish a temporary solution from a permanent one. Only then compare cores, thicknesses and finishes for the conditions in each zone.



