Specifying termPIR ETX for the façade of a commercial building

PIR insulation

At a glance

When specifying termPIR ETX external insulation for a commercial building, start the take-off at the windows. The width of the reveal limits the insulation depth at the frame, while the position of the finished façade determines the sill projection. The board has a rigid PIR core and a gas-permeable glass fleece facing for use in an external thermal insulation composite system (ETICS). Before ordering, establish which thicknesses the chosen system covers, what the fixings will anchor into and how the insulation meets the window. Mark corner fixing zones on the elevation. Allow at least one month between manufacture and installation, as the manufacturer requires.

termPIR ETX insulation board with the PIR core and facing visible

Measuring reveals and sills

Mark the exposed frame width, render line and sill position on a plan section through a typical window. Measure several windows. Frames set at different depths can require different cuts even where the openings are the same size.

Assign a detail from the selected ETICS documentation to each recurring reveal. Check that it covers the substrate, board type and thickness, and the render termination at the frame. Use that detail to measure the required profiles in linear metres.

Fixings in the main wall area and at corners

CS(10/Y)120 describes the board under compression. Specifying anchors requires other information, including the load-bearing substrate, wind action and anchor performance in that masonry. Mark the designed boundary of each corner zone on the elevation.

Distinguish the board from the finished façade when checking fire performance. The reaction-to-fire class of the uninstalled termPIR ETX board is F at 20–49 mm and E at 50–250 mm. Check the classification of the specified complete build-up against the project requirement.

Which conductivity applies to each thickness?

The ETX data sheet gives λD = 0.027 W/(m·K) from 20 mm up to but excluding 80 mm. From 80 mm up to but excluding 120 mm it gives 0.026, and from 120 to 250 mm inclusive it gives 0.025 W/(m·K). Pair each thickness in the schedule with its own value.

For example, the manufacturer lists a declared thermal resistance of 3.05 m²·K/W for an 80 mm board and 4.80 m²·K/W for a 120 mm board. At the window, a section through the wall-to-frame junction is also needed to assess heat flow.

Board orientation and checks at the first window

Show the crew the print on the board before bonding starts. In this system the printed face goes against the wall. Check the first board before the adhesive conceals the marking, then stagger the joints in successive courses.

At the first opening, compare the cuts around the window corners with the system drawing. Check the plane of the boards and the profile positions before applying the reinforced base coat. Record the measurements for the crews working on subsequent openings.

Assessing existing render before bonding

Map the existing wall by the condition of its finish. Mark detached render, peeling paint and damp areas before positioning pallets so the delivery leaves repair areas accessible.

Once unsound layers have been removed, inspect the surface that will receive the adhesive. It should be sound, even, dry and clean. Where efflorescence is present, establish the source of moisture before covering the wall. Record findings against the scaffold bay concerned.

Ordering materials for one elevation

The standard board measures 600 × 1200 mm. Use effective cover for profiled edges. For each elevation, allow for cuts around openings, reinforcement, fixings, profiles and sill flashings as specified in the system.

Read the manufacturing date on every pack. If two batches arrive together, assign each its earliest installation date, observing the required one-month interval. Allocate packs to scaffold bays so the right batch is available as work proceeds.

7 branches. Materials closer to your project.

  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]
Mapa oddziałów: Olsztyn, Serock, Błonie, Łódź, Radom, Wrocław i Gorzów Wlkp.

Free quote

What to include in your enquiry

Tell us how you plan to use the material, the dimensions and the quantity you need. Include the thickness, grade or variant name, along with the delivery town or your preferred collection branch. For a specific product, add its name or a link to the product page. We will reply to the email address you provide to discuss availability and the terms of your order.

Read next