What can replace asbestos cement roofing?
Renovation and maintenance
Choose the replacement roof for the building’s future use. An unheated outbuilding may need a simple trapezoidal steel covering; a house may suit tile-effect sheets, while an insulated sandwich panel is worth pricing for a heated workshop. First have the old fibre cement identified without disturbing it. If asbestos is suspected, leave removal and disposal to a specialist and coordinate the roofer’s start date with that contractor. Before ordering new sheets, check the structure, pitch and support spacing, and leave room in the budget for damage that only becomes visible when the roof is opened.

What should you check before choosing a replacement?
Establish what the existing sheets contain. Not all fibre cement contains asbestos, but older products may. Never break or grind a sheet to identify it. Check the building records and arrange a safe assessment. If asbestos is suspected, do not disturb the covering yourself; engage a specialist to handle the removal.
Next have the roof frame, battens and joints assessed. Once the sheets have been removed, damp and previously concealed damage may come to light. Allow for repairs. The old sheet weight alone cannot determine the replacement: the structure, snow loads and intended use of the loft must all be considered.
When is trapezoidal steel sheet a good choice?
The simple lines of trapezoidal steel sheet suit many outbuildings and can also work on a house with a restrained design. T18 is a relatively shallow profile; T35 has deeper ribs. That difference does not justify wider batten spacing without checking the load tables for the particular product.
Set the sheet length and effective cover width before ordering. Long sheets reduce end laps but need unloading space and careful lifting onto the roof. In an unheated building, assess condensation risk: sheet steel itself neither insulates the roof nor regulates indoor humidity.
When do cut-to-length or modular tile-effect sheets make sense?
Tile-effect steel is useful where a traditional pattern is wanted. Price cut-to-length sheets for a simple slope; short modules can be easier around dormers and changes in geometry. Each system has its own batten gauge and laps. Check the supports left by the old fibre cement and adapt them as needed.
Check the minimum pitch of the chosen profile. Not every tile-effect sheet suits a low-pitched outbuilding. Specify flashings, underlay and ventilation to suit the complete roof build-up. Colour is the visible part of the renovation; durability also depends on the layers that will be concealed.
Can insulated roof panels replace asbestos cement sheets?
A roof sandwich panel is worth considering where the building will be heated or heat loss needs to be reduced. Two steel facings and an insulating core form a complete envelope component. Replacing the old sheets can therefore provide insulation at the same time. Select the core thickness for the thermal performance required of the whole roof.
Check supports, spans, fixings and pitch before switching to panels. Do not substitute a wall panel for a roof panel: the outer profile and the way the joints shed water differ. Use eaves, ridge and service penetration details intended for the selected roof panel.
How should removal and reroofing be coordinated?
Agree a sequence with the asbestos contractor and the roofing crew so the building does not stand unprotected between jobs. Provide a rain protection plan, an unloading area and access to the exposed structure. Time the new delivery to the actual progress of the removal and repair work.
The specialist must arrange suitable packaging, transport and transfer of the asbestos waste to an authorised facility. It must not go into ordinary builders’ rubble. Keep evidence of the completed service. Check any funding before work starts: a local scheme may cover waste removal without paying for the new roof.
Should you add insulation when replacing the roof?
If heating is planned, the open roof offers a chance to inspect and improve the insulation layers. PIR boards may be useful where build-up depth is limited. Another material may better suit the structure or fire requirements. Choose on the basis of a section through the whole roof.
Adding insulation without addressing vapour control and airtightness can change the moisture conditions within the roof. The revised thickness also affects flashings, eaves and chimney junctions. A coordinated renovation design lets you price those changes before purchase rather than rebuilding new details later.
Which costs should the comparison include?
Include removal, waste management, structural repairs and the complete replacement covering in each quote. Add flashings, fasteners, rainwater goods and labour. If insulating, allow for the layers that control water vapour too. A comparison based only on sheet prices may favour an incomplete proposal.
Match the replacement to the use of the building. Trapezoidal sheet may be sufficient on a simple unheated structure; a tile-effect profile can suit a house. For a heated workshop, calculate an insulated panel alternative. Have the technical suitability of each shortlisted option confirmed before ordering.
Free quote
What to include in your enquiry
Tell us how you plan to use the material, the dimensions and the quantity you need. Include the thickness, grade or variant name, along with the delivery town or your preferred collection branch. For a specific product, add its name or a link to the product page. We will reply to the email address you provide to discuss availability and the terms of your order.
Read next
A good installation plan for T18 or T35 starts at the eaves, before the first sheet goes up. Check the diagonals of…
Shallow T7 sheet gives soffits, wall cladding and gate infill a subtle rib pattern. It needs even supports and carefully divided bays.…
To select gutters for a metal roof, mark the area draining to each outlet on a roof plan. A valley may concentrate…
The instructions for your roof covering tell you where PV mounts may be fitted, how to seal penetrations and how to protect…
The cost of covering 200 m² depends on how many whole sheets you order. Allow for flashings, fasteners, delivery and installation as…
Structural trapezoidal steel decking provides a lightweight load-bearing base for industrial and warehouse roofs. It covers large areas quickly, but rib depth…
For an open shelter or carport, select the roof sheet together with the supports and anchors. Wind can reach the underside, and…
Start a flat roof design by tracing how rain will reach an outlet and where it will go if that outlet blocks.…













