Choose a material

Roofing sheets

Blachy trapezowe

Sandwich panels

Płyty warstwowe

PIR insulation boards

Płyty izolacyjne PIR

XPS

Izolacja XPS

Accessories

Akcesoria montażowe

Fencing

Sztachety metalowe

Corners and openings in sandwich panel walls: when to specify bespoke flashings

Sheet metal flashings

At a glance

Two openings of the same width can need different flashings. Reveal depth, panel thickness, frame position and the way the facings end determine the folds at the head, jambs and sill. Use a bespoke flashing when a standard section cannot cover the junction and direct water out of it. Check the dimensions of the installed frame before fabrication, mark the exposed face and distinguish left- and right-hand parts. The trim finishes the joint; it does not brace the opening, support the door or window, or replace the tapes and seals behind it.

Asymmetrical folded flashing with a short and a long leg pointing in opposite directions

Schedule openings by their actual dimensions

Compare the design dimensions with the prepared opening. Check straightness, diagonals and frame position before fabrication. Custom flashings should fit the agreed detail, not hide an unresolved discrepancy in the steelwork. Resolve significant deviations before ordering the complete set of trims.

Distinguish internal and external corner profiles

The type of corner determines the bend direction and which face is visible. A section that looks right in outline may show the back of the sheet after installation. Mark the exposed face, both leg dimensions and the actual angle if the corner is not square.

Cover the intended joint without restraining movement that the facings need. A long vertical joint may need a different solution from a short return beside a door. Do not replace a folded three-dimensional trim with a flat strip without checking what the joint must do.

Trace drainage at the head, jambs and sill

The head flashing works with the cladding above to keep runoff out of the joint. A sill or drip flashing below needs a clear discharge edge. Jamb pieces join the two zones. Detail their ends as carefully as the straight runs: an open corner can let water track behind an otherwise sound surround.

Set the sequence of assembly by the runoff direction and the frame detail, not just ease of access. Arrange laps accordingly. The metal trims do not replace specified tapes and seals. Show each layer in section before the surround hides the panel edges.

Separate cover trims from structural members

The structural frame around the opening and the door or window fixings must carry their design loads independently of the decorative trim. The same distinction applies at the wall base, where a starter support and a thin cover strip serve different purposes. Several folds and a stiff appearance are no proof of capacity.

Ask the fabricator to confirm that a special section can be folded as drawn. Structural parts also require design checks; manufacturability alone does not establish capacity. State the intended use on the order so a cover is not supplied where the project needs a support or frame member.

SteelProfil sheet metal flashings – explore the range and get a free quote

Specify the material and coated face for each piece

Choose galvanised, aluminium-zinc-coated or colour-coated sheet for the location and exposure. If both faces of a reveal are visible, specify the finish of each. A deep recess can expose a return hidden in a front elevation. Marking the fold orientation avoids surprises on site.

Verge trims, ridge caps, gutter aprons and chimney flashings can share a colour scheme without requiring identical materials. For an interior subject to washdown or deposits, also check compatibility between the coating and the cleaning agents in use.

Identify each detail and inspect before covering

Give every flashing type a reference linked to the drawing and installation position. Add the grid line or opening number on larger buildings to distinguish similar and mirrored pieces. Before proceeding with repetitive work, inspect a complete first opening, including its seals.

Inspect ends, fixings, cut panel edges and drainage paths. Photograph the layers that will be hidden, then remove swarf and waste after installation. With the parts and photos linked to the drawings, maintenance staff can identify the precise corner or opening on later inspections.

Questions and answers

Can one angle trim finish every side of an opening?

No. The head, jambs and sill may have different functions and drainage directions. Select the set for the actual wall section and the installed frame.

Can a cover trim replace a door frame?

No. The door frame and its fixings have structural requirements of their own. The trim finishes the specified joints.

How can similar parts be kept apart on site?

Use a detail number and drawing, identify the coated face and assign the piece to a particular opening. Mark left- and right-hand versions separately.

7 branches. Materials closer to your project.

  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]
Mapa oddziałów: Olsztyn, Serock, Błonie, Łódź, Radom, Wrocław i Gorzów Wlkp.

Free quote

What to include in your enquiry

Tell us how you plan to use the material, the dimensions and the quantity you need. Include the thickness, grade or variant name, along with the delivery town or your preferred collection branch. For a specific product, add its name or a link to the product page. We will reply to the email address you provide to discuss availability and the terms of your order.

Read next