Planning roof upgrades across a housing estate
Roof works across a housing estate can be tendered together, but each block needs its own survey. The height of a roof access threshold, the position of an outlet or the condition of the deck can determine the roof build-up. Where space is tight, compare the insulation thicknesses needed for the same thermal resistance. Plan ventilation penetrations and equipment fixings before laying the membrane. Adjust the heating controls to the demand after refurbishment. To assess the work, compare energy consumption, indoor temperatures and occupancy before and after the changes.











