How can you spot sandwich panel installation errors before closing the façade?
Inspect sandwich panel work in stages while each junction is still accessible. Start with the frame, then inspect the first panel and its fixings before the crew repeats the detail across the wall. Compare support spacing and alignment with the drawings. Check openings and bearing surfaces, particularly at industrial doors. Resolve missing supports and misaligned rails before installing the cladding. Tightening screws to pull a panel against a crooked frame can distort the facing. Once flashings cover the joint, even a flat-looking façade can conceal problems with fixings, insulation or seals.






