SOPREMA EFYOS BLUE A on a large roof. Planning the parapet junction

PIR insulation

At a glance

When specifying EFYOS BLUE A on an industrial roof, measure from the finished membrane to its termination at the parapet. Clearance can be tightest where the roof rises, even if the parapet stays level. Compare those sections before grouping stretches of the perimeter under one detail. Increasing the PIR thickness from 100 to 120 mm changes both thermal resistance and membrane level. Assign each board thickness to a roof zone on the order. Show the space for the waterproofing upstand and coping fixings on the drawing.

SOPREMA EFYOS BLUE A boards with blue facings and cream PIR core

Mapping the roof perimeter

Mark corners, steps and changes in fall on the roof plan. Put the section number beside the corresponding length of perimeter so the roofer can identify it from the roof itself.

Reading the BLUE A data sheet

At each step, record the deck and the underside of the proposed coping against one datum. Include the full build-up and the rise due to falls. This schedule gives the available parapet height at each location.

What another 20 mm changes

The PIR core has a 50 µm aluminium facing on each side. The data sheet gives λD of 0.022 W/(m·K), CS(10/Y)120 and reaction-to-fire class E. For profiled edges, check the cover dimension before counting rows.

Declared RD is 4.50 m²·K/W at 100 mm and 5.45 m²·K/W at 120 mm. With the deck and all other layers unchanged, the 120 mm option leaves 20 mm less height for the parapet junction.

A section at the high point

If clearance at the upper end of a fall is insufficient for the detail, mark the surveyed levels on a section for the designer. The solution must accommodate the membrane termination and the shape of the coping.

Inspecting the first corner

Before fitting the metal coping, inspect insulation and waterproofing continuity at the corner. Measure the vertical upstand from the finished membrane and compare it with the approved detail for that location.

Scheduling deliveries by section

Check thickness, edge type and size on the delivery label. Count full rows separately from pieces cut for steps. Agree pallet locations with the person responsible for roof load capacity.

Measurements for maintenance

File the section number, measured height and a photograph taken before installing the coping. When the covering is renewed, these records help identify where an extra layer requires the termination to be redesigned.

7 branches. Materials closer to your project.

  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]
Mapa oddziałów: Olsztyn, Serock, Błonie, Łódź, Radom, Wrocław i Gorzów Wlkp.

Free quote

What to include in your enquiry

Tell us how you plan to use the material, the dimensions and the quantity you need. Include the thickness, grade or variant name, along with the delivery town or your preferred collection branch. For a specific product, add its name or a link to the product page. We will reply to the email address you provide to discuss availability and the terms of your order.

Read next