Choose a material

Roofing sheets

Blachy trapezowe

Sandwich panels

Płyty warstwowe

PIR insulation boards

Płyty izolacyjne PIR

XPS

Izolacja XPS

Accessories

Akcesoria montażowe

Fencing

Sztachety metalowe

BauderPIR FA-TE at terrace thresholds and roof outlets

PIR insulation

At a glance

When specifying BauderPIR FA-TE on a service terrace above a heated room, start with a section through the threshold and nearest outlet. Survey both points against the same datum. Show the insulation thickness, waterproofing, supports and paving. A single low threshold can determine the available depth, while the outlet position sets the length of the fall. Base quantities on the specific board offered. FA-TE appears in data sheets for different markets, so check the edge profile and usable dimensions for the proposed delivery.

Small-format BauderPIR FA-TE boards with aluminium faces and square edges

Threshold and outlet in one section

With the door open, check its swing against the proposed paving and grille position. Mark the space required to lift the grille for outlet cleaning on the plan.

Identifying the FA-TE variant

Record deck levels at the frame and the outlet. At each point determine the top of the waterproofing and the finished paving level. These four levels show whether the specified build-up fits along the route.

Allowing for the fall

Bauder’s UK sheet describes a 1200 × 600 mm square-edged FA-TE board with aluminium on both sides. If the quotation lists a cover size of 1185 × 585 mm, obtain the sheet for the quoted article number and confirm the rebate before ordering.

An illustrative 2% fall over 2.5 m gives a level difference of 50 mm. Use the actual design length and gradient in this calculation. If there is insufficient depth at the threshold, the designer should review the entire build-up, including the required thermal resistance.

Laying out boards beside the door

Mark board outlines and joints at each jamb. A cardboard template helps transfer an irregular shape. Check the fit against the installed frame before the crew cuts further pieces to the same pattern.

Terrace paving supports

Show the reaction at one support and the area over which it bears. The assembly needs assessment for sustained loading and membrane protection. A short-term PIR compression result alone cannot establish the permissible pedestal load.

Inspection before covering the outlet

While the outlet is exposed, inspect the flange-to-membrane connection and compare the surveyed level with the drawing. Before paving, check access to the strainer and that the grille can be reseated.

Records for the maintenance team

File the terrace number, a photograph of the uncovered outlet and the sheet for the board actually supplied. When paving is replaced, maintenance staff can locate the supports and restore outlet access without lifting the neighbouring field.

7 branches. Materials closer to your project.

  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]
Mapa oddziałów: Olsztyn, Serock, Błonie, Łódź, Radom, Wrocław i Gorzów Wlkp.

Free quote

What to include in your enquiry

Tell us how you plan to use the material, the dimensions and the quantity you need. Include the thickness, grade or variant name, along with the delivery town or your preferred collection branch. For a specific product, add its name or a link to the product page. We will reply to the email address you provide to discuss availability and the terms of your order.

Read next