Insulating a produce store and workshop under one roof
On the floor plan, mark the heated part of the workshop and trace the airflow through the produce store. That will help you decide whether to insulate the roof, install a lower ceiling or build an airtight partition between the rooms. Check how long the connecting doors stay open when vehicles pass through. On a roof section, mark the ventilation ducts, supports and any signs of water ingress. Use the drawing to establish where panels can go and what needs repair before installation. Select the core, facings and joints for the temperature, humidity and cleaning regime in each part of the building.








