Inspecting industrial building flashings before the cladding crew leaves site
Inspect the concealed parts of each cladding junction before fitting its final cover, then inspect the finished flashings at handover. A photograph of a straight ridge cap cannot show whether the panel ends were closed or the seal beneath it was continuous. Agree inspection points with the installer before work starts. For each detail, compare the supplied parts with the drawings, check the fixings and trace the water path through every lap and change of direction. Record the location of photographs and repairs, and remove swarf before it stains the coating.











