SOPREMA PIR boards on industrial roofs. Coordinating layers at rooflights

Three layers with different functions meet at a rooflight kerb. On the warm side, the vapour control layer needs a continuous junction to its designated surface on the kerb. EFYOS BLUE A meets the kerb insulation, while the roof membrane keeps water out of the external junction. Draw the path of each layer and identify when it can be inspected. This matters particularly where several identical rooflights are being fitted alongside roofing work. Include the rooflight number in photographs so a concealed connection can be identified during maintenance.

By |2026-11-13T17:22:33+01:0013 November 2026|PIR insulation|Comments Off on SOPREMA PIR boards on industrial roofs. Coordinating layers at rooflights

SOPREMA EFIGREEN ITE on large façades. Insulation continuity and brackets

Use the first window on the hall façade as a sample for the remaining bays. Show the EFIGREEN ITE insulation return at the reveal, the bracket position and the space for flashing. The actual frame-to-subframe distance determines whether the detail fits and can vary between storeys. Draw a horizontal section at the jamb and a vertical section at the sill. Together they show insulation continuity, fixing positions and the drainage path. Inspect these junctions before fitting the cladding, while the edges of the boards are accessible.

By |2026-11-13T17:22:32+01:0013 November 2026|PIR insulation|Comments Off on SOPREMA EFIGREEN ITE on large façades. Insulation continuity and brackets

EFIGREEN ALU+ XL on industrial roofs. Choosing a board layout

Divide the roof into the open field and the services strip before choosing an EFIGREEN ALU+ XL board size. Full boards fit readily in the open field. Between plant bases, the dimensions of cut pieces determine yield. XL covers different sizes depending on thickness. Draw the actual quoted size on the plan and check which offcuts fit the next row. Compare material use, number of cuts and the route from the unloading point. The resulting schedule can be used to order boards for each part of the building.

By |2026-11-13T17:22:30+01:0013 November 2026|PIR insulation|Comments Off on EFIGREEN ALU+ XL on industrial roofs. Choosing a board layout

EFYOS BLUE SMART A on industrial roofs. Setting out falls to outlets

Order EFYOS BLUE SMART A boards from the falls plan. Start at one outlet. Mark its catchment boundary, outlet level, high points and the direction in which the boards increase in thickness. An area of identical size can need different tapers when the outlet is closer to the edge. List codes and quantities separately for each catchment. If the installer moves an outlet, this makes it possible to check the extent of the change, revise the schedule and identify which crews need the new drawing.

By |2026-11-13T17:22:29+01:0013 November 2026|PIR insulation|Comments Off on EFYOS BLUE SMART A on industrial roofs. Setting out falls to outlets

SOPREMA EFYOS BLUE A on a large roof. Planning the parapet junction

When specifying EFYOS BLUE A on an industrial roof, measure from the finished membrane to its termination at the parapet. Clearance can be tightest where the roof rises, even if the parapet stays level. Compare those sections before grouping stretches of the perimeter under one detail. Increasing the PIR thickness from 100 to 120 mm changes both thermal resistance and membrane level. Assign each board thickness to a roof zone on the order. Show the space for the waterproofing upstand and coping fixings on the drawing.

By |2026-11-13T17:22:28+01:0013 November 2026|PIR insulation|Comments Off on SOPREMA EFYOS BLUE A on a large roof. Planning the parapet junction

Eurothane G between a heated room and a stairwell. Specifying the wall

When insulating a wall between a heated room and a cooler stairwell, the side chosen for Eurothane G matters. On the room side, the lining takes up floor space and changes the thermal conditions in the masonry. On the stair side, its thickness may reduce the clear passage or handrail clearance. Measure the landing and check moisture and stairwell fire requirements before choosing. Eurothane G combines PIR with plasterboard. For the thermal calculation and door frame order, distinguish the insulation core thickness from the overall depth of the finished lining.

By |2026-11-13T17:22:27+01:0013 November 2026|PIR insulation|Comments Off on Eurothane G between a heated room and a stairwell. Specifying the wall

Powerdeck F on industrial roofs. Deck preparation and fixing

A bonded roof with Powerdeck F has two interfaces to check. The first secures the insulation to its substrate. The second bonds the roof covering to the board face. Suitability depends on compatibility at both interfaces and on the condition of any layers retained during refurbishment. The contractor needs the facing type, adhesive requirements and surface preparation method before bringing pallets onto the roof. Mechanical attachment also requires a suitable anchoring substrate. Choose a first installation bay that allows inspection of a typical board joint as well as a membrane termination at an obstruction.

By |2026-11-13T17:22:26+01:0013 November 2026|PIR insulation|Comments Off on Powerdeck F on industrial roofs. Deck preparation and fixing

Recticel Powerroof for roof refurbishment. Working from above

Above-rafter insulation with Recticel Powerroof allows much of a refurbishment to be carried out from outside. Whether the attic lining can stay depends on the condition of the rafters, the existing layers and access to their junctions. Before stripping the covering, establish how far the roof surface will rise at the eaves, rooflights and chimney. Check how the new counterbattens will be fixed through the insulation into the rafters. Board quantities depend on the installed cover dimensions of the tongue-and-groove edges. For the works programme, the deciding figure is how much exposed roof the crew can weatherproof that day.

By |2026-11-13T17:22:24+01:0013 November 2026|PIR insulation|Comments Off on Recticel Powerroof for roof refurbishment. Working from above

Eurothane Silver on a large roof. Insulation, fixings and load planning

A roof plan for Eurothane Silver should show what holds the covering and insulation against wind uplift and how equipment loads reach the structure. Corners, edges and equipment supports deserve particular attention. A single figure for the PIR board cannot determine the fixing design in these zones. Before ordering, combine the wind-zone drawing with a section through the deck, vapour control layer, insulation and membrane. Schedule board formats separately for open areas and narrow spaces around equipment housings. The first completed bay can then be inspected for both the board layout and the connections between layers.

By |2026-11-13T17:22:23+01:0013 November 2026|PIR insulation|Comments Off on Eurothane Silver on a large roof. Insulation, fixings and load planning

Recticel Eurofloor beneath a staff-area floor. Insulation and imposed loads

Lockers on feet, a circulation route and a heated office floor place different demands on the same floor build-up. When specifying Recticel Eurofloor, mark where heavy fittings bear on the floor and show the screed, heating system and insulation in section. Declared thermal resistance helps compare board thicknesses. To assess deflection and long-term performance, the designer also needs to know how the screed transfers loads to the insulation. At a doorway to the hall, the finished floor level matters too. Gathering these details before ordering allows the team to coordinate the threshold, cutting plan and pipe routes while the substrate is still accessible.

By |2026-11-13T17:22:22+01:0013 November 2026|PIR insulation|Comments Off on Recticel Eurofloor beneath a staff-area floor. Insulation and imposed loads