IKO enertherm MG on a hall roof: handing over insulation before waterproofing

On a hall roof insulated with IKO enertherm MG, plan the end of each day’s work so the roofers can inspect the facing and protect open edges. The condition of the coated glass fleece matters for the layer above, particularly where the design calls for a bonded membrane. Before covering an area, check the board designation and thickness against the specification, inspect joints and examine the surface around rooflights and service penetrations. Agree who takes over the area and how it will be protected overnight. Recheck it after rain or access by other trades, even if it was ready for waterproofing the day before.

By |2026-11-13T18:03:14+01:0013 November 2026|PIR insulation|Comments Off on IKO enertherm MG on a hall roof: handing over insulation before waterproofing

IKO enertherm ALU TAP: scheduling tapered insulation for a large roof

On a large roof, order IKO enertherm ALU TAP tapered boards by drainage area. The total area in square metres does not tell you how many boards need a particular thickness at each end. Two boards can look alike and have the same length, yet swapping them can leave a step beneath the waterproofing. Mark each outlet, the direction of drainage and the board sequence on the layout drawing. At delivery, separate the packs by drainage area. Check the first row from the low edge to the high edge before repeating its arrangement across the roof.

By |2026-11-13T18:03:13+01:0013 November 2026|PIR insulation|Comments Off on IKO enertherm ALU TAP: scheduling tapered insulation for a large roof

IKO enertherm KR ALU under heated screeds in commercial buildings

A doorway between a corridor and a heated room reveals whether the floor build-up fits between the structural slab and the door leaf. With IKO enertherm KR ALU, check the thermal resistance of the insulation, the space for pipes and screed, and the loads on the finished floor separately. Survey the substrate on both sides of the opening and mark the common finished floor level. Tiles and adhesive can take up a different depth from a resilient floor covering. The doorway detail should also show heating pipes and any planned movement joints. This gives the designer time to resolve differences before the insulation goes in.

By |2026-11-13T18:03:11+01:0013 November 2026|PIR insulation|Comments Off on IKO enertherm KR ALU under heated screeds in commercial buildings

IKO enertherm ALU TG over large areas. Checking tongue-and-groove joints

For IKO enertherm ALU TG, choose the laying direction before cutting the first row. The tongue on one factory edge must slide into the groove of the adjoining board. A column, recess or final strip may leave too little room for that movement. Mark these positions on the plan and draw the cut edges. Dry-fit the first row using the actual positions of obstructions. This shows where an offcut can be reused and where a fresh board with the edge profile in the correct position is needed.

By |2026-11-13T18:03:10+01:0013 November 2026|PIR insulation|Comments Off on IKO enertherm ALU TG over large areas. Checking tongue-and-groove joints

IKO enertherm ALU in an industrial building. Board properties and assembly requirements

Where IKO enertherm ALU is used on the roof, in walls and below the floor on one project, assign each delivery to a specific section drawing. Thermal conductivity and the compression test result describe the board. At a service penetration, the performance of the assembly also depends on its substrate, linings, fixings and opening detail. IKO lists the board’s reaction to fire separately from its classification in a specified steel-deck application. Compare those conditions with the design before issuing boards to the crew. On the penetration drawing, mark the insulation junction and the components providing the seal.

By |2026-11-13T18:03:09+01:0013 November 2026|PIR insulation|Comments Off on IKO enertherm ALU in an industrial building. Board properties and assembly requirements

BauderPIR FA beneath rooftop equipment. Assessing loads at each support

Placing equipment on a roof insulated with BauderPIR FA requires the load at each foot and the load path to the structure. Equipment mass and overall footprint alone are insufficient. Loads can be uneven, and a foot may touch the substrate along just two narrow strips. Show the membrane protection, load spreader, insulation and supporting deck in section. Consider loads during operation alongside installation and servicing conditions. These inputs allow the designer to identify which supports can share a detail and where a separate support arrangement is needed.

By |2026-11-13T18:03:08+01:0013 November 2026|PIR insulation|Comments Off on BauderPIR FA beneath rooftop equipment. Assessing loads at each support

BauderPIR T on large roofs. Setting out valleys, falls and plant zones

When laying BauderPIR T, first set out the valley that will carry water to the outlet. Mark levels at both ends and wherever the valley changes direction. The fall marked on a tapered board describes one plane. Where two planes intersect, the gradient along their common line can differ. Check the longitudinal profile of the valley separately, particularly beside plant bases. Transfer the plan to the roof using one datum for deck and insulation levels. This allows a step in the route to the outlet to be identified before waterproofing.

By |2026-11-13T18:03:07+01:0013 November 2026|PIR insulation|Comments Off on BauderPIR T on large roofs. Setting out valleys, falls and plant zones

BauderPIR M/MF beneath industrial roof waterproofing. Specifying the facing

If a supplier offers an aluminium-faced board in place of BauderPIR M or MF, start with two questions. How will the layer’s thermal resistance change, and can the specified waterproofing be fixed to the new surface? Both M and MF have a PIR core with mineral fleece on each face. Their edge profiles differ, which affects the joint layout. Specify the variant, thickness and method of securing the waterproofing on the order. These details allow the designer to assess the substitution and the roofer to identify the intended delivery before opening the pallets.

By |2026-11-13T18:03:05+01:0013 November 2026|PIR insulation|Comments Off on BauderPIR M/MF beneath industrial roof waterproofing. Specifying the facing

BauderPIR FA-TE at terrace thresholds and roof outlets

When specifying BauderPIR FA-TE on a service terrace above a heated room, start with a section through the threshold and nearest outlet. Survey both points against the same datum. Show the insulation thickness, waterproofing, supports and paving. A single low threshold can determine the available depth, while the outlet position sets the length of the fall. Base quantities on the specific board offered. FA-TE appears in data sheets for different markets, so check the edge profile and usable dimensions for the proposed delivery.

By |2026-11-13T18:03:04+01:0013 November 2026|PIR insulation|Comments Off on BauderPIR FA-TE at terrace thresholds and roof outlets

BauderPIR FA on large roofs. Specifying boards and calculating coverage

Use the installed dimensions of 2385 × 1185 mm when ordering BauderPIR FA for a warehouse roof. The external dimensions of 2400 × 1200 mm matter for handling, but the rebated edges overlap once boards are laid. The difference is apparent in a single row. Ten modules along the long edge give a setting-out length of 23.85 m. Draw the ends at parapets, rooflights and movement joints separately. A schedule of full boards and cuts lets the crew assign material to each roof section and check whether the same delivery will cover the last one.

By |2026-11-13T18:03:02+01:0013 November 2026|PIR insulation|Comments Off on BauderPIR FA on large roofs. Specifying boards and calculating coverage