Thermano ETICS on a façade. How to assess the composite board

When choosing Thermano ETICS for a rendered façade, start with a wall section through a window. It shows the space required for the composite, the finished render line and the necessary sill projection. The board has a PIR core and a factory-applied outer layer of EPS 20 mm thick. The ordered thickness already includes both materials. Compare variants using the thermal resistance of the entire board. Mortar, fixings, reinforcement and render must suit the documented system for the building. This guide follows a row of windows from board selection and cutting through to inspection before the reinforced base coat conceals the joints.

By |2026-11-13T16:53:31+01:0013 November 2026|PIR insulation|Comments Off on Thermano ETICS on a façade. How to assess the composite board

Thermano GK for staff areas. Insulating walls between temperature zones

A changing room beside a cool factory hall calls for a different wall specification from an office between two heated rooms. Before selecting Thermano GK, record the temperature and use of the spaces on both sides. The panel combines PIR insulation with 12.5 mm plasterboard. GK-A suits ordinary dry interiors, while GK-H2 has a lining with reduced water absorption. Enter the variant, total thickness, areas exposed to water and fixing arrangements for fittings on the room schedule. This allows the team to assess thermal performance and check clearances for doors, lockers and services after installation.

By |2026-11-13T16:53:30+01:0013 November 2026|PIR insulation|Comments Off on Thermano GK for staff areas. Insulating walls between temperature zones

Thermano Compact for building details. Planning small boards on a large project

When ordering Thermano Compact for reveals, recesses and narrow perimeter strips, start with the dimensions of each insert. Two areas of equal size can require different numbers of 600 × 1200 mm boards. Cut length, laying direction and the position of a factory lap all affect the yield. Measure a representative detail, draw a cutting plan and assign each piece to an installation point. Check thermal resistance and declared compressive stress for the chosen thickness. A trial reveal will show whether there is space for the flashing and how the insert meets the adjoining insulation.

By |2026-11-13T16:53:29+01:0013 November 2026|PIR insulation|Comments Off on Thermano Compact for building details. Planning small boards on a large project

Thermano Roof beneath rooftop equipment. What does CS 200 kPa tell you?

The foot of an air handling unit transfers weight to a small part of the roof. To assess Thermano Roof boards beneath it, the designer needs the reaction at each support, its contact area and the sequence of layers down to the structural deck. CS(10/Y)200 describes how the PIR board behaves in a compression test. Permanent loading also calls for data on deformation over time and the settlement the equipment base can tolerate. The example below shows how to calculate average contact pressure from installation data. Membrane protection, drainage and service access also influence the support layout.

By |2026-11-13T16:53:27+01:0013 November 2026|PIR insulation|Comments Off on Thermano Roof beneath rooftop equipment. What does CS 200 kPa tell you?

Thermano Deck on an industrial roof. Insulation thickness, board layout and deliveries

Three dimensions matter when ordering Thermano Deck for an industrial roof: insulation thickness, effective board cover and the distance between details that limit each row. TOP and MASTER edges give different cover despite identical overall board dimensions. Thickness also affects the declared thermal conductivity and compression test result. On the roof plan, show the deck rib direction, outlets, equipment bases and the limits of each day’s work. Read this plan alongside a section through the vapour control layer and waterproofing to decide which boards belong in each area and how to protect exposed sections from rain.

By |2026-11-13T16:53:26+01:0013 November 2026|PIR insulation|Comments Off on Thermano Deck on an industrial roof. Insulation thickness, board layout and deliveries

termPIR AL GK in staff rooms adjoining a cold warehouse

When insulating the heated side of a wall between staff rooms and a cold warehouse, trace the thermal boundary at the ceiling, doors and adjoining walls. A termPIR AL GK panel combines PIR insulation with gas-tight facings on both sides and a 12.5 mm plasterboard lining. Use the PIR thickness to calculate the resistance of that layer and the full panel thickness to set out the finished wall face. Before installation, check masonry condition, moisture exposure, socket locations and cabinet supports. Rooms of similar size can require different cuts and fixings because of their door and equipment layouts.

By |2026-11-13T16:53:24+01:0013 November 2026|PIR insulation|Comments Off on termPIR AL GK in staff rooms adjoining a cold warehouse

termPIR WS on an industrial roof. Matching the insulation and waterproofing

On a flat industrial roof, start by establishing how the waterproofing will be attached. The termPIR WS board has a rigid PIR core with gas-permeable glass fleece on both faces. For an adhered roof, the system documentation must cover the selected membrane and adhesive on that facing. A mechanically fixed assembly needs a fixing design for the actual deck. Mark the outlets, equipment supports and the end of each work section on the roof plan. Use the plan to allow for cut pieces, maintain service access and protect exposed insulation edges from water until the waterproofing is continuous.

By |2026-11-13T16:53:23+01:0013 November 2026|PIR insulation|Comments Off on termPIR WS on an industrial roof. Matching the insulation and waterproofing

Using termPIR MAX 19 AL where roof build-up height is limited

On an industrial roof being refurbished, the space beneath the existing parapet flashing may determine which insulation fits. The termPIR MAX 19 AL board has a PIR core and gas-tight laminate facings containing aluminium, paper and polyethylene. The manufacturer declares a thermal conductivity of 0.019 W/(m·K) for thicknesses of 80–220 mm. From the required thermal resistance, calculate the depth of insulation and check whether the finished roof fits under the flashing. Measure around the entire perimeter and account for the other layers and equipment supports. Compare the costs of two complete options, including changes at the roof edge.

By |2026-11-13T16:53:22+01:0013 November 2026|PIR insulation|Comments Off on Using termPIR MAX 19 AL where roof build-up height is limited

Specifying termPIR ETX for the façade of a commercial building

When specifying termPIR ETX external insulation for a commercial building, start the take-off at the windows. The width of the reveal limits the insulation depth at the frame, while the position of the finished façade determines the sill projection. The board has a rigid PIR core and a gas-permeable glass fleece facing for use in an external thermal insulation composite system (ETICS). Before ordering, establish which thicknesses the chosen system covers, what the fixings will anchor into and how the insulation meets the window. Mark corner fixing zones on the elevation. Allow at least one month between manufacture and installation, as the manufacturer requires.

By |2026-11-13T16:53:21+01:0013 November 2026|PIR insulation|Comments Off on Specifying termPIR ETX for the façade of a commercial building

termPIR AL in a large building. How to assess a lightweight insulation layer

When refurbishing an industrial building with low door thresholds, measure the height from the substrate to finished floor level before choosing termPIR AL boards. Allow for the floor finish and the layer that spreads the load. The remaining depth is available for insulation. The board has a rigid PIR core and gas-tight laminate facings containing aluminium, paper and polyethylene on both sides. Its declared thermal conductivity lets you estimate the resistance available at that depth. Check how the insulation continues beneath the doorway and how heavy equipment transfers its weight into the floor. Test the proposed detail at one doorway before ordering for the whole building.

By |2026-11-13T16:53:20+01:0013 November 2026|PIR insulation|Comments Off on termPIR AL in a large building. How to assess a lightweight insulation layer