Receiving and inspecting swissporPIR Alu deliveries on a large project

When swissporPIR Alu arrives for several industrial buildings, assign each pallet to a specific work area before lifting it to the roof. Match the label to the order, inspect the corners and underside of the pack, then mark the storage location on the plan. A damaged pack can then be isolated, documented and replaced without interrupting work elsewhere. Delivery order also depends on how many boards the crew can install and protect from rain. The following checks follow a pallet from unloading and storage to the inspection before the insulation is covered.

By |2026-11-13T19:40:59+01:0013 November 2026|PIR insulation|Comments Off on Receiving and inspecting swissporPIR Alu deliveries on a large project

Planning swissporPIR Alu installation on a large pitched roof

Installing swissporPIR Alu above the rafters raises the roof covering relative to the eaves, roof windows and chimney. On a large slope, start by drawing a strip from eaves to ridge through one roof window. This section shows the drainage path, the connection to the wall insulation and the path of the screws from counter-battens into rafters. Measure the existing components on site. Check whether the other windows are set at the same height. Divide the slope into sections the crews can fix and weatherproof before the end of the shift.

By |2026-11-13T19:40:57+01:0013 November 2026|PIR insulation|Comments Off on Planning swissporPIR Alu installation on a large pitched roof

Fixing swissporPIR Alu to an industrial roof deck

Start laying swissporPIR Alu on an industrial roof in a bay that includes an outlet and a known profile of steel deck. There you can see where the board bears, what the fastener anchors into and whether water will reach the drain once the insulation is in place. The manufacturer's instructions require mechanical fixing even where adhesive is used. Fastener quantities and positions follow the design for the particular roof. Inspect the deck, fixings and insulation before covering the first bay. Identify a route for the crews and an unloading area for the next delivery as well.

By |2026-11-13T19:40:56+01:0013 November 2026|PIR insulation|Comments Off on Fixing swissporPIR Alu to an industrial roof deck

Joining swissporPIR Alu boards across a large roof area

On a long roof, joint alignment is particularly easy to check where two runs of swissporPIR Alu pass either side of a rooflight and meet again beyond its kerb. If the runs start at different angles, a wedge-shaped gap appears on the far side. Before cutting, establish a reference line across the bay, draw the joints and check the edge orientation on the first pair of boards. The manufacturer offers square FIT/GK, rebated LAP/SF and tongue-and-groove TAG/NuF edges. Each affects how cut pieces fit. A two-layer build-up also needs a separate joint layout for the upper course.

By |2026-11-13T19:40:55+01:0013 November 2026|PIR insulation|Comments Off on Joining swissporPIR Alu boards across a large roof area

Fitting swissporPIR Alu insulation within a fixed roof height

When refurbishing an industrial roof, a single low threshold can determine the thickness available for swissporPIR Alu. The measured distance from the deck to the threshold must accommodate all the layers, the fall and the waterproofing detail. Drawing these first shows how much depth is left for insulation. The manufacturer declares a thermal resistance of 5.45 m²K/W for the 120 mm board. Use this figure in the whole-roof calculation, then check the proposed section at rooflights, plant supports and the access walkway. The example below takes those measurements through to a board schedule.

By |2026-11-13T19:40:54+01:0013 November 2026|PIR insulation|Comments Off on Fitting swissporPIR Alu insulation within a fixed roof height

Choosing Kingspan insulation for a project with several roof zones

If a supplier proposes a different Kingspan board while an industrial building is under construction, start with the roof section covered by the offer. Therma TR26 and TR27 both have PIR cores, but their facings differ. A substitution can affect the connection to the waterproofing, the thickness needed for the specified thermal resistance and the clearance at thresholds. Kooltherm uses a phenolic core. Record the full board designation, mark the area on the roof plan and compare the two details. The buyer, the person receiving the pallets and the roofer laying the first boards can then work from the same drawing.

By |2026-11-13T19:40:52+01:0013 November 2026|PIR insulation|Comments Off on Choosing Kingspan insulation for a project with several roof zones

Kingspan Therma TF70 in ancillary rooms: floor levels and loads

How much space is available for Kingspan Therma TF70 at a doorway between a changing room and a factory corridor? Measure from the substrate to the specified finished floor level on both sides. Deduct the finishes, screed, services and other layers shown in the design section, then compare the available PIR board thicknesses. Where cupboards, equipment or racks will stand, also check how their loads pass through the floor. A room schedule recording levels, finishes and equipment helps select the insulation and gives the screeding crew a basis for accepting the substrate.

By |2026-11-13T19:40:51+01:0013 November 2026|PIR insulation|Comments Off on Kingspan Therma TF70 in ancillary rooms: floor levels and loads

Kingspan Therma TT46 on large flat roofs: setting out falls and outlets

The roof outlet position is the starting point for laying out Kingspan Therma TT46 tapered insulation. On the warehouse roof plan, mark the catchment boundaries, drainage directions and level of each outlet. Overlay the outlines of plant bases, rooflights and thresholds. The drawing shows whether water can reach the outlet from behind an obstruction and how much flashing height remains at the high edge of the insulation. Moving one outlet can change several rows of boards. Before delivery, match each pack reference to its catchment and the current revision of the falls plan.

By |2026-11-13T19:40:50+01:0013 November 2026|PIR insulation|Comments Off on Kingspan Therma TT46 on large flat roofs: setting out falls and outlets

Kingspan Therma TR27 on industrial flat roofs

On a warehouse roof with bonded waterproofing, the suitability of Kingspan Therma TR27 depends on the combination of its facing, the adhesive and the membrane. The PIR core has a glass tissue facing on both sides. Before work begins, agree the condition in which the insulation crew will hand the surface over to the roofers and how much they can cover in one shift. Mark maintenance routes, plant bases and membrane terminations on the plan. Each requires different protection, cutting and inspection from the open field. These quantities help with comparing bids and inspecting the first completed area.

By |2026-11-13T19:40:47+01:0013 November 2026|PIR insulation|Comments Off on Kingspan Therma TR27 on industrial flat roofs

Kingspan Therma TR26 on a lightweight industrial roof

Will a rooflight kerb still have enough height for a watertight flashing after insulation is added to a lightweight industrial roof? With Kingspan Therma TR26, the answer depends on the kerb height, PIR thickness and finished roof level. Measure all three at the lowest kerb before ordering boards for the entire roof. Use the same section to show where the board ends, how it meets the vertical insulation and where rainwater drains. These dimensions form the basis for setting out the boards, specifying the fixing system and pricing repeated junctions.

By |2026-11-13T19:40:45+01:0013 November 2026|PIR insulation|Comments Off on Kingspan Therma TR26 on a lightweight industrial roof