IDELCO Smartbuild System: specifying a prefabricated SIP wall and its insulation

In the IDELCO Smartbuild System, the item ordered is a prefabricated element with a defined position on the erection drawing. An α-therm SIP panel consists of a PIR core and OSB facings that work together structurally. Plot door openings, service penetrations and supports on the same drawing before fabrication. At delivery, match the panel reference to the grid line, orientation and drawing revision. This helps the crew place similar-looking elements in their intended positions and inspect each connection before the finishes conceal it.

By |2026-11-13T18:54:06+01:0013 November 2026|PIR insulation|Comments Off on IDELCO Smartbuild System: specifying a prefabricated SIP wall and its insulation

IDELCO AGRO+ ceilings in farm buildings: planning long boards and their joints

Three measurements matter when ordering IDELCO AGRO+ ceiling boards for a livestock building or farm store: the length of the area to be insulated, the designed support spacing and the space needed to turn a board indoors. The manufacturer makes boards 1200 mm wide to specified lengths, up to 13 m for certain variants. Before releasing the schedule for production, measure several positions and trace the route from the delivery vehicle to the last ceiling bay. This helps identify rows suitable for a single long board and rows where a designed cross joint is more practical.

By |2026-11-13T18:54:05+01:0013 November 2026|PIR insulation|Comments Off on IDELCO AGRO+ ceilings in farm buildings: planning long boards and their joints

IDELCO α-therm SARKING on a large pitched roof: handling and setting out the boards

An IDELCO α-therm SARKING board is 2.4 m long. On a large pitched roof its size helps cover uninterrupted areas, but it also affects unloading, lifting and cuts around roof windows and valleys. Before starting the over-rafter insulation, trace one board’s route from the pallet to the least accessible part of the roof. Check the build-up at the eaves in section, including the underlay level and its discharge into the gutter. Size each work area around the amount of insulation the crew can install and protect from rain in one shift.

By |2026-11-13T18:54:04+01:0013 November 2026|PIR insulation|Comments Off on IDELCO α-therm SARKING on a large pitched roof: handling and setting out the boards

IDELCO α-therm WALL in cavity walls: keeping the PIR layer continuous

How can a site team check the continuity of IDELCO α-therm WALL insulation on a warehouse or office façade? Select a full structural bay that includes the plinth, a window and the lintel. Plot the actual wall tie positions and the outlines of the 1200 × 600 mm PIR boards on an elevation. This reveals where a tongue-and-groove joint meets a cut edge. Inspect those joints, cavity width and drainage below the window before laying the outer leaf. Once the masonry goes up, photographs may be the only record of concealed details.

By |2026-11-13T18:54:03+01:0013 November 2026|PIR insulation|Comments Off on IDELCO α-therm WALL in cavity walls: keeping the PIR layer continuous

Planning a large industrial flat roof with IDELCO α-therm ROOF

How should you set out IDELCO α-therm ROOF PIR boards on an industrial flat roof? Start with a plan showing rooflights, plant bases and drainage paths. On an unobstructed bay it is easy to count full boards. Around an air-handling unit, the widths of strips between supports and the number of cut edges determine how much insulation and labour to allow. Mark the roof covering’s fixing zones on the same drawing. This gives the team a common reference for three separate checks: roof thermal performance, resistance to wind uplift and the loads that rooftop plant transfers to the building structure.

By |2026-11-13T18:54:02+01:0013 November 2026|PIR insulation|Comments Off on Planning a large industrial flat roof with IDELCO α-therm ROOF

Utherm Wall LE in cavity walls: checking insulation around a window

Choose a window bay when inspecting Utherm Wall LE in a cavity wall. Here the crew can see the main insulation layer, wall ties passing through boards, the lintel junction and the drainage path together. Inspect the bay while the outer leaf is still low enough to see the work. On the window section, mark the face of the inner leaf, both faces of the PIR board and the specified clear cavity width. Compare these dimensions with the actual masonry, especially at projecting mortar joints and reveal corners. Photographs of the first bay with measurement points marked provide a reference for subsequent windows.

By |2026-11-13T18:54:01+01:0013 November 2026|PIR insulation|Comments Off on Utherm Wall LE in cavity walls: checking insulation around a window

Utherm Roof BM on flat roofs: matching the facing to the waterproofing

Utherm Roof BM has two different glass fleece facings. B identifies the bituminised face and M the mineral-coated face. Before opening further pallets on a large roof, the roofer should be able to point out on a section which face meets the substrate, which meets the first waterproofing layer and how each junction is formed. This requires a specification for the complete assembly, including the waterproofing and attachment method. Lay the first board beside the drawing and photograph the exposed facing. When another crew starts the next section, it will have a reference even after the packaging has gone.

By |2026-11-13T18:54:00+01:0013 November 2026|PIR insulation|Comments Off on Utherm Roof BM on flat roofs: matching the facing to the waterproofing

Utherm Floor LE in service rooms: specifying the floor beneath equipment

An office and an adjoining plant room can have the same finished floor level even though the floor beneath a heavy cabinet needs a different way of distributing loads. When specifying Utherm Floor LE, ask the cabinet supplier for the operating weight, foot dimensions and support positions. Mark the delivery route as well, since small wheels may carry the load during installation. Check these figures against the screed design and the layers below it. At the doorway, check the common finished level. Above occupied rooms, also identify the impact sound requirements. Together these details determine the floor build-up to be ordered.

By |2026-11-13T18:53:57+01:0013 November 2026|PIR insulation|Comments Off on Utherm Floor LE in service rooms: specifying the floor beneath equipment

Utherm Sarking LE Plus on a large pitched roof: detailing the roof windows

On a pitched roof with rows of roof windows, a Utherm Sarking LE Plus layout should show both the PIR board joints above the rafters and the drainage path on the underlay. Each board has tongue-and-groove edges on all four sides and a factory-bonded underlay with an overlap on the outside. Cutting a window opening removes some of those edges. Before ordering, draw one window with the adjacent boards, counterbattens and underlay connection to the frame. This detail identifies the extra material, support for cut pieces and access the roofer needs to complete the junction.

By |2026-11-13T18:53:56+01:0013 November 2026|PIR insulation|Comments Off on Utherm Sarking LE Plus on a large pitched roof: detailing the roof windows

UNILIN Utherm Roof LE on a hall roof: planning insulation around rooflights

A row of rooflights creates two different tasks for a crew laying Utherm Roof LE on a hall roof. Board size affects how quickly the open area can be covered. At rooflight kerbs, the layout depends on the gaps between openings, the height of the waterproofing upstand and the space for fixings. Before ordering PIR boards, measure a typical gap and the final bay near the roof edge, where the spacing may differ. Draw the kerb outlines and board joints to scale. The cutting plan then shows how many whole boards will fit and which offcuts can be used in the next bay.

By |2026-11-13T18:53:55+01:0013 November 2026|PIR insulation|Comments Off on UNILIN Utherm Roof LE on a hall roof: planning insulation around rooflights